Pages

Saturday, December 10, 2011

Half Covered

So I have a little over 50% of the inside covered.


The shower side is left to be done.

I Just covered the upper back side - 
this is where the AC will go this summer.

Once I get the power figured out I'm ready to start on the tank!!


No comments:

Post a Comment